Corowa Solar Farm
This was completed on behalf of Metka. The project included bulk earthworks, drainage, road construction and concrete pier construction.
This was completed on behalf of Metka. The project included bulk earthworks, drainage, road construction and concrete pier construction.
This 12 lot industrial sub division was completed on behalf of The Greater Hume Shire. It consisted of bulk earthworks, sewer and water reticulation, drainage, road construction and utilities such as power and Telstra.
Project included the installation of sewer, water and drainage reticulation along with other assets such as comms, gas and electricity. The construction of a new road which included lime stabilising of the subgrade and asphalting.
This project was completed under the supervision of MIL and Eartech. Our tasks included the demolition of existing channel boards, de-silting channels, installation of new automatic gates and rock beaching.
We have completed numerous projects along the Murray river. Our tasks include remediating the eroded banks by placing rock along the effected areas. Each site is treated as an environmentally sensitive area.
Our tasks included site preparation, importation and placing of material for the construction of the court. Laser levelling surface on grade and the installation of the net and lines.