Corowa Solar Farm
This was completed on behalf of Metka. The project included bulk earthworks, drainage, road construction and concrete pier construction.
This was completed on behalf of Metka. The project included bulk earthworks, drainage, road construction and concrete pier construction.
This project was completed on behalf of The Greater Hume Shire. This consisted of the removal of the existing kerb, footpath and roadway on both sides of the main street. We then installed all new drainage, kerb, street furniture, paving, concreting and asphalt foot paths.
This 12 lot industrial sub division was completed on behalf of The Greater Hume Shire. It consisted of bulk earthworks, sewer and water reticulation, drainage, road construction and utilities such as power and Telstra.
This project was completed on behalf of The Greater Hume Shire. It consisted of the installation of new drainage, kerb and gutter, footpaths, feature concreting and the replacement of the existing roadway.
Project included the installation of sewer, water and drainage reticulation along with other assets such as comms, gas and electricity. The construction of a new road which included lime stabilising of the subgrade and asphalting.